Scheduling (P8)

The following 24 min 40 sec clip takes you through the core part of Timegate - Scheduling. It looks at how scheduling is controlled by a series of settings that you need to align to your business rules. There are various places within Timegate where scheduling activities can be undertaken. these too are covered in the clip.