Scheduling (P8)
The following 24 min 40 sec clip takes you through the core part of Timegate Web - Scheduling. It looks at how scheduling is controlled by a series of settings that you need to align to your business rules. There are various places within Timegate Web where scheduling activities can be undertaken. these too are covered in the clip.
Want more detail?
- What do I need to do before I start scheduling?
- How can I schedule in Site View?
- How can I configuring the Area/Post/Slot headings?
- How can I schedule using the Duty Filter?
- How can I do scheduling in the Branch view?
- How do I schedule in Branch view using the Histogram?
- How do I view schedules in Site Teams to monitor budgets?
- How do I add a Duty?
- How do I add an Employee to a Duty?
- Can I add an Employee to multiple Duties at one time?
- How are Employee(s) removed from Duties?
- How can I Roll Back Schedules?
- How can I avoid Manual Rotaloading?
- How do I edit and update Site Contracted Times?
- How can I delete a Duty?
- How can I reinstate a Duty?
- How are Open Posts filled?
- How can I do a Search for employees that are available (Suitable Employees)?
- How can I add Temporary Work?
- How can I remove Temporary Work?
- How is a Duty confirmed?
- How can a Duty's Unconfirmed flag be removed?
- How are Employee Duties swapped across the same Sites?
- How are Employee Duties swapped across different Sites?
- How do I add a Premium to a Duty?
- How do I remove a Premium from a Duty?
- How are Duties split?
- What is a Sub Duty?
- How do I assign a Sub Duty?
- How do I make an Adhoc Duty a Scheduled Duty?
- How do I set up a Proportional Meal and Rest Break?