Setup: Sites - Contract Times - Introduction

The following video demonstrating how to manually set up Contract Times and how to assign employees to them.

How to get there: Set Up | Sites | Contract Times Tab

This is used to store the Contracted Service Delivery requirements for the Site. The information is used for many
different reasons:

  • A baseline for budget compliance and comparison reporting

  • Automatic creation of Contracted Duties in Timegate Web for Employees to perform. This tracked using Timegate Web Time and Attendance (T&A) Devices

  • Formulation of Employee Work Patterns that are used to pay Absence

When a contract has been won, a breakdown of how the contract is to be serviced is normally broken down and documented in a mobilisation document. This is shared with many parties in the business for review.

The Operations Team would then take this information and formulate how the services are to be delivered. This sometime comes from the Incumbent Supplier as a starting point or from the Mobilisation Document proposed and agreed as part of the tender. This may consist of single or multiple shift patterns of different teams of Employees with different skills. For example:

  • 1 x Cleaner Monday to Friday 0600-0900

  • 24/7 Security Guard on three-week rolling twelve-hour shift pattern

This requirement can be either calculated then entered manually, or populated using the Contract Wizard from a library of Shift Patterns already defined in the system.  

The key areas for this are shown and detailed below.

Screen Layout and Fields

inset_000722.jpg

The screen is split into several sections that are all controlled by the Timegate Web Security Function Role assigned to the user. These sections are detailed within this document.

Screen Actions

Save

Click to Save Site changes

Delete Site

Click to delete the Site from the system. A confirmation pop-up will be shown confirming the deletion which will remove all duties for the Site from the system

Refresh

Click to revert to the unsaved state

Site View

Opens the Site View screen for the Site

View Branch

Opens the Branch screen for the Site

View Customer

Opens the Customer screen for the Site

View Site Group

Opens the Site Group screen for the Site

View Site Budget

Opens the Site Budget screen for the Site

Site Events

Opens the Events Search for the Site

Contract Wizard

Pop-up window allowing the Contract to be setup using a Wizard using predefined Shift Patterns. Very useful where a Site has multiple weeks in rotation patterns within the
same Site

Fill open post

Function that will fill any open posts that exists in the Schedule that has now been allocated with an Employee within the Contract Times

Validate Contract

Function to identify where an Employee is already assigned to another Site within the current selected Effective Date

Add Contract

Adds a new blank Effective Date for the contract to be manually added

Copy Contract

Copied the existing Effective Date to a new Effective Date to manually modify

Delete Contract

Delete the current selected Effective Date

|<

Go to First Slot

>|

Go to Last Slot

< and >

Go to Previous/Next Page of Slots